EMAYA: Electric Vehicle Recharging Point Project

EMAYA is a public company, with 100% municipal capital, owned by the City Council of Palma.

Its function is to manage the public services provided to citizens related to the integral water cycle, the selective collection of solid urban waste and street cleaning, ensuring maximum quality and efficiency, within a framework of sustainability.

The project aims at the execution of the Installation of Electric Vehicle Recharging Points in different centers. The centers are:

  • Son Pacs outdoor enclosure: 26 RVE points.
  • Son Pacs subway parking: 34 RVE points.
  • Joan Maragall subway parking: 4 RVE points.
  • Son Tugores outdoor enclosure: 4 RVE points.
  • EDAR 1 outdoor enclosure: 4 RVE points.
  • Verge de Monserrat outdoor enclosure: 8 RVE points.

The purpose of the project is on the one hand the reduction of polluting emissions, as well as the reduction of the company’s electricity costs. The purpose of the proposed installation is to enable the recharging of the EV fleet.

A charging infrastructure with charging mode 3 is proposed. The system must also allow full integration with the OCPP 1.6 protocol, which will allow proper power management in each installation.

For Bettergy, the installation of this type of infrastructure is part of its strategy to change the energy model, as a growth vector for the coming years.

Thanks to the installation of these recharging points Emaya has obtained the following results:

Bettergy continues its development work in these projects, betting on a complete turnkey integration for its customers, supplying and installing the equipment, providing its expertise in energy project engineering, and at the same time managing the different available subsidies.

Asesórate con expertos

Si quieres conocer más detalles sobre la instalación fotovoltaica o de puntos de recarga, en Bettergy podemos ayudarte en el 952 025 789 / 651 46 87 26 o por correo a través de comercial@bettergy.es

Other news

Improved Lighting in Port Areas

Port of Malaga; energy audit service and pre-engineering of the exterior lighting project. The Port of Malaga is a logistic enclave, with …

With the recent publication of Order TED 268/24 by the Ministry for Ecological Transition and Demographic Challenge (MITERD), the country commits to …

Bettergy will work with Banco Centroamericano, the main financial institution in the region, to develop the Energy Efficiency market in the countries …

SERVICIOS DE REDACCIÓN Y DIRECCIÓN DE OBRA DEL PROYECTO DE MONITORIZACIÓN DEL CONSUMO ENERGÉTICO A PRESTAR A LA RED DE PARQUES TECNOLÓGICOS …